Complete the form below to download the case study.
CASE STUDY
Post-Storm Assessment Program for Electric Cooperative
The Situation
An electric cooperative in the southeast was hit by a once-in-a-lifetime winter ice storm. Osmose worked with the electric utility on other programs but had not worked with them to create a contingency plan if they faced severe weather. After the storm hit, Osmose was the first group called to help get the power back on for impacted members and perform a detailed post-storm inspection.
Fill out the form to download and read the solution.